Now showing items 1-8 of 8

    • Thilagan, Leslie; Pettinato, Brian; Buck, Jeff; Schaefer, Alex (Turbomachinery Laboratories, Texas A&M Engineering Experiment Station, 2015)
    • Thilagan, Leslie; Pettinato, Brian; Buck, Jeff; Schaefer, Alex; Haught, Jeff; Shifflett, Ken (Turbomachinery Laboratories, Texas A&M Engineering Experiment Station, 2016)
    • Thilagan, Leslie; Pettinato, Brian; Rutan, Charles; Buck, Jeff; Schaefer, Alex (Texas A&M University. Turbomachinery Laboratories, 2013)
    • Thilagan, Leslie; Pettinato, Brian; Rutan, Charles; Buck, Jeff; Schaefer, Alex (Texas A&M University. Turbomachinery Laboratories, 2014)
    • Thilagan, Leslie; Pettinato, Brian; Haught, Jeff; Buck, Jeff; Schaefer, Alex; Shifflett, Ken (Turbomachinery Laboratory, Texas A&M Engineering Experiment Station, 2017)
    • Thilagan, Leslie; Pettinato, Brian; Haught, Jeff; Buck, Jeff; Schaefer, Alex; Shifflett, Ken (Turbomachinery Laboratory, Texas A&M Engineering Experiment Station, 2018)
      Suggested Topics: Introduction Plant Wide Maintenance and Problems Effective Maintenance Programs Best Practices Oil Varnish Oil / Grease Type and Selection Testing and Maintenance Including Frequency Mixing and ...
    • Schaefer, Alex (Turbomachinery Laboratory, Texas A&M Engineering Experiment Station; Texas A & M University. Libraries; Texas A & M University. Libraries, 2020)
      Well designed and properly commissioned auxiliary systems are crucial to the reliability of rotating equipment. This paper addresses the upfront hardware selection and commissioning of pneumatically actuated control valves ...
    • Schaefer, Alex; Pettinato, Brian (Turbomachinery Laboratory, Texas A&M Engineering Experiment Station, 2022)
      Well designed and properly commissioned auxiliary systems are crucial to the reliability of rotating equipment. This paper addresses the upfront hardware selection and commissioning of pneumatically actuated control valves ...